Rooms/Ceramics: Difference between revisions

From CreatorSpace Wiki Demo
Jump to navigation Jump to search
Add Room form default and floor-plan room records
 
Update ceramics room from procedure deck
 
Line 1: Line 1:
{{Room|Name=Ceramics|Zone=Creative fabrication|Steward=Ceramics stewards - verify|Status=Review|AccessNotes=Orientation required for clay work; kiln, glaze, and dust-control steps need steward approval.|Hours=Open-hours use; verify any supervised, booked, or after-hours access with current stewards.|Reservation=Coordinate wheels, shared tables, glazing space, drying shelves, and firing queues with ceramics stewards.|SafetyLevel=Training required|Equipment=Clay worktables, wheels, wedging surface, glaze area, drying shelves, ceramic tools - create equipment records after inventory.|Training=[[Training/Ceramics Orientation]], [[Training/Kiln Orientation]] - create after steward review.|Supplies=Clay, glazes, slips, tools, sponges, cleanup buckets, drying shelves, and labeled work-in-progress storage.|Links=[[File:creatorspace-floorplan-ground-floor-room104.png]], [[CreatorSpace Content Dashboard]]|Summary=Floor-plan room for clay work, ceramics projects, glazing workflow, drying storage, and kiln-adjacent process tracking.}}
{{Room|Name=Ceramics|Zone=Creative fabrication|Steward=Mel Gromek; co-steward Rachel Gamblin - from October 2026 procedure deck; verify current|Status=Review|AccessNotes=Complete [[Training/Ceramics Orientation]] with a steward before equipment use; kiln operation requires separate steward-led training.|Hours=Open-hours use; verify any supervised, booked, or after-hours access with current stewards.|Reservation=Room capacity is six. Sign in for equipment use and reserve wheels with name, date, and time; coordinate glazing space, drying storage, and firing queues with ceramics stewards.|SafetyLevel=Training required|Equipment=Clay worktables, wheels, wedging surface, glaze area, drying shelves, ceramic tools - create equipment records after inventory.|Training=[[Training/Ceramics Orientation|Ceramics Orientation and Procedures]]; [[Training/Kiln Orientation]] requires separate steward review.|Supplies=Clay, glazes, slips, tools, sponges, cleanup buckets, drying shelves, and labeled work-in-progress storage.|Links=[[File:creatorspace-floorplan-ground-floor-room104.png]], [[CreatorSpace Content Dashboard]]|Summary=Floor-plan room for clay work, ceramics projects, glazing workflow, drying storage, and kiln-adjacent process tracking.}}
{{SeedNotice}}
{{SeedNotice}}
= Ceramics =
= Ceramics =
Line 18: Line 18:


* Confirm whether kiln use lives on this room page or on Forge Welding and Kiln.
* Confirm whether kiln use lives on this room page or on Forge Welding and Kiln.
* Document dust-control, wet-cleaning, reclaim, glaze, and firing-queue rules.
* Review and approve [[Training/Ceramics Orientation]] as the current procedure, including dust control, wet cleaning, reclaim, glaze handling, and firing-queue rules.
* Create equipment pages for wheels, kiln, slab roller, shelves, and any dedicated ventilation.
* Create equipment pages for wheels, kiln, slab roller, shelves, and any dedicated ventilation.


[[Category:Rooms]]
[[Category:Rooms]]
[[Category:CreatorSpace POC]]
[[Category:CreatorSpace POC]]

Latest revision as of 04:01, 13 October 2026

Ceramics
Zone Creative fabrication
Steward Mel Gromek; co-steward Rachel Gamblin - from October 2026 procedure deck; verify current
Status Review
Access Complete Training/Ceramics Orientation with a steward before equipment use; kiln operation requires separate steward-led training.
Hours Open-hours use; verify any supervised, booked, or after-hours access with current stewards.
Proof of concept. This page is sample content for the CreatorSpace Wiki POC. It does not represent approved CreatorSpace policy, verified equipment instructions, or real member data.

Ceramics

This room page was created from the ground-floor floor plan and should be steward-reviewed before it is treated as an official room record.

Ground-floor floor plan with Ceramics context

Floor Plan Placement

The floor plan labels Ceramics as its own area near other hands-on art and fabrication rooms.

Initial Scope

Floor-plan room for clay work, ceramics projects, glazing workflow, drying storage, and kiln-adjacent process tracking.

Steward Review Needed

  • Confirm whether kiln use lives on this room page or on Forge Welding and Kiln.
  • Review and approve Training/Ceramics Orientation as the current procedure, including dust control, wet cleaning, reclaim, glaze handling, and firing-queue rules.
  • Create equipment pages for wheels, kiln, slab roller, shelves, and any dedicated ventilation.